A scope of work that leaves no gaps between trades.

Scope gaps are where change orders come from: work everyone assumed someone else was doing. This template makes you write what is included, what is excluded and who does the excluded work, with the documents, logistics, schedule and closeout requirements alongside.

  • 10 standard sections
  • Exclusions by named trade
  • Contract documents list
  • Word format
Blank bid form template on a clipboard with a pencil, a scale ruler and a hard hat
Download

Get the template. Free, no sign-up.

Example values are placeholders. Replace them with your own rates, units and company details.

SectionWhat to write
Work includedSpecific items with location and spec section
Work excludedEach item and the trade or party that does it
MaterialsWho furnishes, who installs, hoisting
ScheduleMobilization and milestone dates
CloseoutAs-builts, O&M manuals, warranties

Files open in Excel, Google Sheets, Numbers, Word or Google Docs.

Write it tight

Scope language that holds up.

01

Name the party

"Excluded: fire caulking, by Firestopping subcontractor" beats "by others".

02

Reference the spec

Tie each included item to a section, so quality requirements come with it.

03

Cover the in-between work

Blocking, access panels, patching, cleanup, hoisting. Assign them explicitly.

04

List the documents

The scope is only as current as the revision it was written against.

Common gaps

Items that fall between trades.

ItemUsually disputed between
In-wall blockingDrywall, millwork, specialties
Access panelsDrywall, MEP trades
FirestoppingEach penetrating trade, firestopping sub
Housekeeping padsConcrete, mechanical
Final cleaningEach trade, GC
Temporary power and lightingElectrical, GC
Where RenderDraw fits

A template organizes the numbers. RenderDraw fills them from the drawings.

A scope of work starts from what the drawings actually show. RenderDraw proposes quantities by trade with source references, so the inclusions in your scope match what was taken off.

  • Source on every row. Each proposed quantity keeps the sheet and location it came from.
  • Estimator approval before pricing. Your estimator accepts, corrects or rejects proposals; nothing is priced until it is approved.
  • Addenda through the same review. Changed sheets go back through takeoff and estimator review.
  • Your assemblies, your rates. Approved rows hand off to your assemblies, labor units and pricing inputs.
Tape measure, highlighters and a pencil on a printed floor plan for a construction estimate
FAQ

Scope of work construction template, answered.

What is a scope of work in construction?

A document describing exactly what work a contractor or subcontractor will perform, based on which documents, and what is excluded. It is often attached to a subcontract or proposal.

What should a construction scope of work include?

Purpose, contract documents with revisions, work included, work excluded with the responsible party, materials and equipment, site logistics, schedule, quality and acceptance, safety and closeout.

How detailed should a scope of work be?

Detailed enough that two different crews would build the same thing. Reference spec sections and drawing sheets rather than describing the work in general terms.

What is the difference between a scope of work and a statement of work?

In construction they are often used interchangeably. A statement of work sometimes also covers deliverables, pricing and terms.

Is this template free?

Yes. Download the Word file and edit it for each bid package.

Start small

Send one plan set. Judge the result yourself.

A focused, no-obligation evaluation on your own drawings. Your sample files remain private while we assess the request.

  1. Upload one representative plan set (a legible PDF set is the most reliable starting point), plus an addendum if you have one.
  2. RenderDraw reviews the set and the scope you want tested.
  3. We follow up with what was extracted, what was flagged for review, and the most useful next step.

Book a meeting with RenderDraw

Bring your drawings, estimating process, or product configuration questions. Choose a time to talk with our team.

Prefer a separate window? Open the booking page.

Free sample takeoffBook a demo