An RFI that gets a usable answer.

Vague RFIs get vague answers, or none. This form forces the things a design team needs to respond: exact sheet and spec references, one clear question, a proposed solution and the cost and schedule impact. The log tracks every RFI until it closes.

  • Word RFI form
  • References & impact
  • Excel RFI log
  • Days open tracking
Rugged laptop and tablet with marked-up plans, a hard hat and safety glasses on a jobsite plan table
Download

Get the template. Free, no sign-up.

Example values are placeholders. Replace them with your own rates, units and company details.

RFI #SubjectReferenceStatusCost impactLinked CO
RFI-001Door 214 hardware set conflict (example)A-601 / 08 71 00OpenPossible
RFI-002Beam depth vs. duct (example)S-201, M-201AnsweredYesCO-002

Files open in Excel, Google Sheets, Numbers, Word or Google Docs.

Write better RFIs

What design teams need to answer fast.

01

One question per RFI

Bundled questions get partial answers and are hard to track.

02

Exact references

Sheet, detail, spec section and revision.

03

A proposed solution

Gives the reviewer something to approve instead of designing from scratch.

04

Impact stated

Cost and schedule impact flagged up front, so changes are not a surprise later.

Bid phase vs. construction

Two kinds of RFI.

Bid phaseQuestions before pricing

  • Sent through the GC or bid contact
  • Answers usually issued as an addendum
  • Deadline set in the bid documents

Construction phaseQuestions during the work

  • Sent to the design team through the GC
  • Answer may lead to an ASI or change order
  • Response time often set in the contract
Where RenderDraw fits

Track RFIs next to the scope they change.

RenderDraw keeps the source sheet on every proposed quantity, so when an RFI answer changes scope you can find the quantities it affects.

  • Source on every row. Each proposed quantity keeps the sheet and location it came from.
  • Estimator approval before pricing. Your estimator accepts, corrects or rejects proposals; nothing is priced until it is approved.
  • Addenda through the same review. Changed sheets go back through takeoff and estimator review.
  • Your assemblies, your rates. Approved rows hand off to your assemblies, labor units and pricing inputs.
Stylus on a tablet showing a color-coded floor plan next to a printed plan sheet
FAQ

Rfi construction template, answered.

What should a construction RFI include?

RFI number, date, project, recipient, subject, exact drawing and spec references, one clear question, a proposed solution, cost and schedule impact, attachments, and a space for the response.

Who sends RFIs in construction?

Usually the general contractor, on its own behalf or for a subcontractor, to the architect or engineer. Subcontractors normally route RFIs through the GC.

How long should an RFI response take?

Many contracts set a response time. If yours does not, put a 'response needed by' date on every RFI, based on when the answer affects the work.

What is the difference between an RFI and a change order?

An RFI asks a question. If the answer changes scope, cost or time, the change is formalized in a change order.

Why keep an RFI log?

To track open questions, days outstanding and which answers led to change orders. It is also useful documentation if delays are disputed.

Start small

Send one plan set. Judge the result yourself.

A focused, no-obligation evaluation on your own drawings. Your sample files remain private while we assess the request.

  1. Upload one representative plan set (a legible PDF set is the most reliable starting point), plus an addendum if you have one.
  2. RenderDraw reviews the set and the scope you want tested.
  3. We follow up with what was extracted, what was flagged for review, and the most useful next step.

Book a meeting with RenderDraw

Bring your drawings, estimating process, or product configuration questions. Choose a time to talk with our team.

Prefer a separate window? Open the booking page.

Free sample takeoffBook a demo