Misc. & ornamental metals

Misc. metals takeoff that finds what hides on the A-sheets.

Misc. and decorative metals live everywhere except the structural framing plans: lintel schedules, stair and rail details, elevator pits, roof screens, ornamental features. RenderDraw searches the whole set and lists them with the sheet attached, so nothing is found after award.

Send one plan set. See what the AI extracts and what it flags for review. No obligation.

  • Lintels, stairs, rails, embeds
  • Ornamental and decorative items
  • Architectural + structural sheets
Tied steel rebar mat on chairs over slab formwork ready for a concrete pour
Where misc. metals hide

A checklist for Division 05 50 00 scope.

ItemTypical sourceQuantity
Loose lintelsLintel schedule, wall sectionsCount and length by size
Stairs and landingsStair plans, sections, detailsFlights, risers, landings
Handrails and guardrailsStair and floor plans, detailsLinear feet by type
Ladders, ships laddersRoof plans, mechanical sheetsCount, height
Embeds and anchorsStructural and architectural detailsCount by type
Bollards, pipe guardsSite and floor plansCount
Decorative / ornamental metalElevations, interior detailsBy item, LF or SF
Elevator pit ladders, sill angles, hoist beamsElevator sheetsCount and length
What gets taken off

The quantities a steel estimator actually needs

These are the items RenderDraw proposes from the drawings, each linked to the sheet it came from, for your estimator to accept, correct or reject.

ItemWhat is measured or countedWhere it comes from
Members by shapeBeam, column and brace counts by size (W, HSS, L, C) with lengthsFraming plans, schedules, sections
Weights / tonnageLength × weight per foot, rolled up by piece typeMember marks + AISC shape tables
ConnectionsShear tabs, moment connections, base plates, embedsTypical details, connection schedules
Misc. metalsLintels, stairs, rails, ladders, embedsArchitectural sheets, details
Deck & joistsDeck area by gauge/profile, joist counts by designationRoof and floor framing plans
How it works

From plan set to reviewed quantities.

AI-powered, human-approved. Each stage records what ran, what changed and who approved it.

Send one plan set

Upload framing plans, column and beam schedules, typical connection details, the structural general notes and the spec sections for structural steel and misc. metals. Add an addendum if you have one.

AI proposes quantities

Counts, lengths and areas come back with the source sheet and location attached to every row.

Estimator review

Low-confidence items surface first. Your estimator accepts, corrects or rejects each one.

Map to your assemblies

Approved quantities map to your items, assemblies and estimating assumptions.

Price reviewed rows

Labor units, material pricing and supplier quotes apply only to rows that passed review.

Hand off with evidence

Approved quantities move on to pricing and visual CPQ with the evidence trail still attached.

Supported files and tasks depend on your trade and implementation. Confirm them in the free sample run.

Fact check

What we checked (November 2026)

  • Handrails (IBC 2021, §1014.2): 34–38 in above stair nosings or the ramp surface.
  • Guards (§1015.3): at least 42 in high, with exceptions for some R-2 and R-3 dwelling units.
  • Guard openings (§1015.4): must not pass a 4-in sphere up to the required height (4⅜ in between 36 and 42 in). Picket spacing drives picket count, so check it before you count.
  • Where misc. metals hide:
    • lintel schedules on architectural sheets
    • elevator pit ladders and sill angles
    • roof hatches and ladders
    • bollards
    • embed plates on structural details
    • edge angles at slab openings
    Search the whole set, not only the structural sheets.
Worked example (illustrative)
Guard 24 ft long, 1/2" sq pickets, 3-7/8" clear (a 4" sphere must not pass) -> 4-3/8" o.c. pickets = 24 x 12 / 4.375 = 65.8 -> 66 (round up per panel; check post locations)
Human review, by design

The AI drafts. Your estimator decides.

Speed is easy to promise. Defensible numbers are the job, so RenderDraw keeps the estimator in control of every quantity that gets priced.

  • Source on every row. Each quantity keeps its source sheet, location and reviewer decision.
  • Lowest confidence first. The review queue shows the drawing tile with the detection highlighted and the extracted value.
  • Uncertain items flagged, not hidden. Anything the AI can't confirm goes to the estimator rather than being guessed.
  • Nothing priced before approval. Rows move on to pricing only after they are accepted.
Embed plates, anchor bolts, steel angle lintels and bollard pipes on a pallet for a miscellaneous metals estimate
FAQ

Questions estimators ask

What are misc. metals?

Metal fabrications outside the primary structural frame, typically in spec Division 05 50 00: lintels, stairs, rails, ladders, embeds, bollards and similar items.

Why are misc. metals easy to miss?

They appear across architectural, structural, MEP and site sheets rather than in one place.

Does RenderDraw do decorative metal takeoffs?

It finds and lists items from elevations and details with the source attached; complex ornamental pieces still need estimator judgement.

What should we send?

The full architectural and structural set plus the misc. and ornamental metals spec sections.

Start small

See what the AI reads on your own drawings.

Send one representative steel plan set. RenderDraw reviews it and follows up with what the AI extracted and what it flagged for review. Your files remain private while the request is assessed, and there is no obligation.

  1. Upload framing plans, column and beam schedules, typical connection details, the structural general notes and the spec sections for structural steel and misc. metals.
  2. RenderDraw reviews the set and the scope you want tested.
  3. We follow up with extracted quantities, flagged items and next steps.
Sources

Sources and further reading

Vendor pages, standards and references checked for this page. Product features and prices change; confirm current details with each vendor.

  1. International Building Code 2021 Chapter 10 (UpCodes viewer) — 1014.2 handrail height, 1015.3 guard height, 1015.4 opening limits
  2. AISC 303-22 Code of Standard Practice — Structural steel vs. other items (scope definitions)

Last reviewed November 2026.

Book a meeting with RenderDraw

Bring your drawings, estimating process, or product configuration questions. Choose a time to talk with our team.

Prefer a separate window? Open the booking page.

Free sample takeoffBook a demo