Signage

Signage takeoff that counts every sign type.

Signage packages list dozens of sign types across floors: room IDs, wayfinding, code-required signs and exterior signage. RenderDraw proposes counts by type from signage plans and schedules, with the sheet attached; reviewed counts can then feed visual CPQ for configured sign products.

Send one plan set. See what the AI extracts and what it flags for review. No obligation.

  • Counts by sign type
  • Schedules reconciled
  • Configured quotes
Construction estimator's desk with a highlighted floor plan takeoff and a building under construction outside the window
Takeoff

What gets quantified.

ItemUnitSource
Room ID signsEach by typeSignage plans
WayfindingEachPlans, schedule
Code signageEachPlans, spec
ExteriorEach, SFElevations
What gets taken off

The quantities a trade estimator actually needs

These are the items RenderDraw proposes from the drawings, each linked to the sheet it came from, for your estimator to accept, correct or reject.

ItemWhat is measured or countedWhere it comes from
CountsSymbols, devices, fixtures and doors against the legendPlans, legends, schedules
LengthsWalls, runs, edges and linear itemsPlans, details
AreasRooms, finishes, roofs, pavingPlans, finish schedules
VolumesConcrete, earthwork, fillSections, schedules
Scope itemsRequirements, exclusions and alternatesSpecs, general notes, addenda
How it works

From plan set to reviewed quantities.

AI-powered, human-approved. Each stage records what ran, what changed and who approved it.

Start with your bid package

Drawings, specs and addenda together: the plan set, legends and schedules, the spec sections for your scope and any addenda.

AI proposes quantities

Counts, lengths and areas come back with the source sheet and location attached to every row.

Estimator review

Low-confidence items surface first. Your estimator accepts, corrects or rejects each one.

Map to your assemblies

Approved quantities map to your items, assemblies and estimating assumptions.

Price reviewed rows

Labor units, material pricing and supplier quotes apply only to rows that passed review.

Hand off with evidence

Approved quantities move on to pricing and visual CPQ with the evidence trail still attached.

Supported files and tasks depend on your trade and implementation. Confirm them in the free sample run.

Fact check

What we checked (November 2026)

  • ADA Standards (2010), Section 216.2: interior and exterior signs that identify permanent rooms and spaces must comply with 703.1, 703.2 and 703.5. That means tactile characters and braille on room-ID signs. Count room-ID signs as a separate type from wayfinding and directional signs, which have different requirements.
  • Mounting height (Section 703.4.1): the baseline of the lowest tactile character must be at least 48 in above the finish floor, and the baseline of the highest no more than 60 in.
  • Location (Section 703.4.2): mount the sign alongside the door at the latch side. At double doors with one active leaf, it goes on the inactive leaf. If there is no wall space, it goes on the nearest adjacent wall.
  • Gotcha: sign location plans often show one symbol per door, while the schedule lists a sign type per room. Reconcile the two lists before pricing so double-door rooms and rooms with two entries are not undercounted.
Human review, by design

The AI drafts. Your estimator decides.

Speed is easy to promise. Defensible numbers are the job, so RenderDraw keeps the estimator in control of every quantity that gets priced.

  • Source on every row. Each quantity keeps its source sheet, location and reviewer decision.
  • Lowest confidence first. The review queue shows the drawing tile with the detection highlighted and the extracted value.
  • Uncertain items flagged, not hidden. Anything the AI can't confirm goes to the estimator rather than being guessed.
  • Nothing priced before approval. Rows move on to pricing only after they are accepted.
Tape measure, highlighters and a pencil on a printed floor plan for a construction estimate
FAQ

Questions estimators ask

How do sign shops estimate?

Count signs by type, apply product pricing and installation.

Can AI count signs?

Yes, by type from signage plans, for review.

Can quotes be configured?

RenderDraw's configurator and visual CPQ support configured products.

What should we send?

Signage plans, schedule and spec.

Start small

See what the AI reads on your own drawings.

Send one representative trade plan set. RenderDraw reviews it and follows up with what the AI extracted and what it flagged for review. Your files remain private while the request is assessed, and there is no obligation.

  1. Upload the plan set, legends and schedules, the spec sections for your scope and any addenda.
  2. RenderDraw reviews the set and the scope you want tested.
  3. We follow up with extracted quantities, flagged items and next steps.
Sources

Sources and further reading

Vendor pages, standards and references checked for this page. Product features and prices change; confirm current details with each vendor.

  1. U.S. Access Board: ADA Accessibility Standards — Sections 216 (signs) and 703 (signage requirements)

Last reviewed November 2026.

Book a meeting with RenderDraw

Bring your drawings, estimating process, or product configuration questions. Choose a time to talk with our team.

Prefer a separate window? Open the booking page.

Free sample takeoffBook a demo