Reference · Estimating

Construction estimating abbreviations

Estimates and drawings are full of abbreviations, and a wrong unit is one of the easiest ways to blow a number. This reference covers the units, drawing abbreviations and contract terms estimators use most, the ones that mean different things in different trades, and the conversions behind them.

  • Units
  • Drawing abbreviations
  • Plumbing and MEP
  • Conversions
Construction estimator's desk with a highlighted floor plan takeoff and a building under construction outside the window
The project legend governs. Abbreviations vary by firm and discipline. Always check the abbreviation list on the general sheets; when a project uses a term differently from common usage, the project's definition wins. Many firms base their lists on the U.S. National CAD Standard.

Units of measure

Abbrev.MeaningTypical use
SFSquare feetFlooring, drywall, paint, roofing
SYSquare yards (9 SF)Carpet, paving, some earthwork
LFLinear feetBase, pipe, conduit, curb, trim
CYCubic yards (27 CF)Concrete, excavation, fill
CFCubic feetSmall volumes, grout
EAEachFixtures, devices, doors
LSLump sumItems priced as one total
SQRoofing square (100 SF)Roofing, siding
BF / MBFBoard foot (144 cubic inches) / thousand board feetLumber
SFCASquare feet of contact areaConcrete formwork
TN / TShort ton (2,000 lb)Steel, asphalt, aggregate
CWTHundredweight (100 lb in U.S. usage)Rebar and steel pricing
GALGallonPaint, coatings
HR / MH / LHHour / man-hour / labor-hourLabor
VFVertical feetRisers, manhole depth

Ambiguous abbreviations to watch

  • MH: man-hour in an estimate; manhole on a civil sheet.
  • C: conduit, cold, ceiling or centerline, depending on the set.
  • EQ: equal (dimensions) or equipment.
  • FD: floor drain on plumbing sheets; fire damper on mechanical sheets.
  • CB: catch basin (civil) or circuit breaker (electrical).
  • T: ton, thermostat, or tread.
  • PF: plumbing fixture, per foot, or power factor.

When the meaning is unclear, send an RFI rather than guessing.

General drawing abbreviations

Abbrev.Meaning
TYP / SIMTypical / similar
NTSNot to scale
AFF / FFEAbove finished floor / finished floor elevation
TOS / TOC / TOW / BOFTop of steel / top of concrete / top of wall / bottom of footing
O.C. / CLR / EQOn center / clear / equal
FV / VIFField verify / verify in field
NIC / BONot in contract / by others
GWB / ACT / VCT / LVTGypsum wallboard / acoustical ceiling tile / vinyl composition tile / luxury vinyl tile
IE / INVInvert elevation

Plumbing, mechanical and electrical

Abbrev.Meaning
WC / LAV / UR / MSWater closet / lavatory / urinal / mop sink
FD / HB / EWCFloor drain / hose bibb / electric water cooler
CW / HW / HWR / DWVCold water / hot water / hot water return / drain, waste and vent
RTU / AHU / VAV / ERVRooftop unit / air handling unit / variable air volume box / energy recovery ventilator
FD / SD / FSDFire damper / smoke damper / combination fire-smoke damper
GFCI / AFCIGround-fault / arc-fault circuit interrupter
MCC / VFD / ATSMotor control center / variable frequency drive / automatic transfer switch
EM / WP / WREmergency / weatherproof / weather-resistant

Contract and estimating terms

Abbrev.Meaning
RFI / ASI / CCDRequest for information / architect's supplemental instructions / construction change directive
PCO / COR / COPotential change order / change order request / change order
OFCI / OFOI / CFCIOwner furnished contractor installed / owner furnished owner installed / contractor furnished contractor installed
GMP / T&M / OH&PGuaranteed maximum price / time and material / overhead and profit
SOV / NTP / LDsSchedule of values / notice to proceed / liquidated damages
AHJ / EORAuthority having jurisdiction / engineer of record
VE / ALTValue engineering / alternate

Conversions

1 SY = 9 SF 1 CY = 27 CF 1 SQ = 100 SF CY = SF x thickness (in.) / 12 / 27 1 BF = 1 in. x 12 in. x 12 in. BF = thickness (in.) x width (in.) x length (ft) / 12 1 m² = 10.764 SF 1 m = 3.281 ft 1 metric ton = 2,204.6 lb
Illustrative conversions
carpet: 1,800 SF / 9 = 200 SY slab: 2,000 SF at 4 in. = 2,000 x 4 / 12 / 27 = 24.7 CY lumber: 20 pieces of 2x10 at 16 ft = 20 x (2 x 10 x 16 / 12) = 533 BF (nominal) roof: 3,450 SF / 100 = 34.5 SQ

Board feet are calculated on nominal dimensions in common U.S. practice; check how your supplier prices.

Abbreviations in proposals

In proposals and scope letters, write units the way the customer uses them. Owners may not know SFCA or MBF, and GCs outside your trade may not know your fixture shorthand. Spell a term out once, followed by the abbreviation. Label the unit on every estimate row; many costly errors are SF priced as SY or LF priced as each.

Where RenderDraw fits

RenderDraw's AI takeoff reads legends and schedules and proposes quantities with their units and sheet sources for estimator review. Try a free sample takeoff, or see the takeoff measurement types guide.

Where RenderDraw fits

Spend your hours on scope and price, not re-counting.

RenderDraw's AI takeoff reads drawings, schedules and specs, proposes quantities with the source sheet attached, and holds uncertain items for estimator review before anything is priced.

  • Source on every quantity. Each count, length and area keeps its source sheet and location.
  • Lowest confidence first. The review queue puts the items most likely to be wrong at the top.
  • Addenda through the same review. Send the changed sheets through takeoff and estimator review, then reprice what moved.
  • Approval before pricing. Nothing moves on to pricing until an estimator accepts it.
Printed floor plan with rooms and wall runs highlighted for a construction quantity takeoff
Honest by design

Send one plan set

Pick a real job with an addendum. Sample files stay private while RenderDraw assesses the request, and there is no obligation to proceed.

RenderDraw does not publish accuracy percentages or time-saved claims. Test it on your own plan set.

FAQ

Questions estimators ask.

What does SFCA mean?

Square feet of contact area, the unit for concrete formwork: the area of form in contact with concrete.

What is a roofing square?

100 square feet of roof surface.

What does MH mean on drawings?

It depends on the sheet: man-hour in estimates, manhole on civil drawings. The project legend governs.

How do you convert square feet to cubic yards?

Multiply SF by thickness in inches, divide by 12, then by 27. A 2,000 SF slab at 4 in. is about 24.7 CY.

What is OFCI?

Owner furnished, contractor installed: the owner buys the item and you install it, so price labor and handling but not material.

Start small

Units labeled on every row.

RenderDraw proposes quantities with units and sources for review.

  1. Upload the plans, specs and schedules, plus an addendum if you have one.
  2. RenderDraw reviews the set and the scope you want tested.
  3. We follow up with extracted quantities, flagged items and next steps.
Sources

Sources and further reading

Standards, manufacturer data and references used for this guide. Numbers marked as rules of thumb are starting points, not substitutes for your own cost history, the project specifications or the manufacturer's current data.

  1. U.S. National CAD Standard — Standard abbreviations and drawing conventions
  2. NIST: Guide for the Use of the International System of Units (SP 811) — Unit conversions
  3. CSI MasterFormat — Specification organization

Last reviewed November 2026.